Flow collection and distribution

Boiler Headers & Manifolds

Header inquiries defined by material, branch arrangement and boiler-system interfaces.

GCB workshop photograph. A project-specific header photograph can be provided when available.

GCB workshop photograph. A project-specific header photograph can be provided when available.

Understand the scope

Boiler Headers & Manifolds
for your project.

Headers collect or distribute fluid between connected boiler tubes. For quotation review, define the body dimensions and material, branch positions, end closures and applicable design conditions.

Define your requirements

What are you looking for?

Distribution headers

Provide the branch layout and interface dimensions for the required assembly.

Collection headers

Define inlet/outlet geometry, materials and the required connection arrangement.

Replacement headers

Identify the existing header and specify the dimensions that must match on site.

Technical review

Specifications that help
us prepare a quotation.

These are the inputs to provide, not fixed product ratings. Dimensions, materials and scope are confirmed against your project requirements.

Header bodyOutside diameter, wall thickness, length and material grade
BranchesQuantity, orientation, spacing, sizes and connection type
End detailsClosures, inspection openings and drawing references
Design basisPressure, temperature and applicable project standard
Inspection scopeRequired examinations, documents and quantities
GCB production workshop
Manufacturing discussion

From your drawings
to an agreed scope.

Our workshop and company materials provide a starting point for discussing fabrication. Project-specific capability, processes and responsibilities are confirmed during technical review.

View our manufacturing page →
01 / REVIEW

Drawings & conditions

Identify the component, interfaces and design requirements.

02 / DEFINE

Materials & scope

Agree specifications, quantities and supply boundaries.

03 / CONFIRM

Quality requirements

Confirm inspections and documentation before production.

04 / PLAN

Packing & delivery

Agree transport requirements and the shipment schedule.

Quality & documentation

Make requirements explicit.

Agree material traceability, branch-position checks, weld examination requirements and final dimensions against the project specification.

Documented license scope

GCB’s Chinese Class A boiler component license covers serpentine tubes, headers, membrane walls and finned economizers. Other equipment inquiries require separate confirmation of applicable authorization and supply scope.

View the original license and scope →
Packing & shipment

Plan for your
delivery conditions.

Include the destination, handling limits and preferred delivery schedule in your inquiry. Packing, lifting and transport arrangements are agreed for the actual order.

Information to confirm

  • Destination and requested delivery terms
  • Component dimensions and handling constraints
  • Required surface and connection protection
  • Packing marks and shipping documents
Before you inquire

Frequently asked questions.

What is essential for a header quotation?

A drawing showing body dimensions, material, branch layout and end details, together with quantities and design conditions.

Can branch positions be customized?

Provide the required positions and orientations in the drawing for technical review.

Are pressure tests included automatically?

Testing requirements, procedures and documentation must be agreed in the supply scope.

Your next step

Discuss your
boiler headers & manifolds requirements.

Email drawings, quantities and project requirements to our team.

info@gcboiler.cn

Attach drawings in your email application. You can also copy the address and send through webmail.

Opens a draft in your email app. Review and send it there; this form does not submit directly.

Explore related products