Panel sections
Provide panel width, length, tube pitch and membrane dimensions.
Water wall panel inquiries with clear tube layouts, openings and connection requirements.

Tube panel photographs from GCB company materials; final panel geometry follows the agreed drawings.
Membrane water walls combine tubes and connecting membranes into boiler furnace panels. Panel geometry, openings and interfaces are essential to an accurate manufacturing inquiry, particularly for replacement sections.
Photographs illustrate component arrangements. Confirm the required application and configuration in your inquiry.
Provide panel width, length, tube pitch and membrane dimensions.
Identify required openings, bends and local connection details on the drawings.
Include interface measurements and reference photographs of the existing installation.
These are the inputs to provide, not fixed product ratings. Dimensions, materials and scope are confirmed against your project requirements.
| Panel dimensions | Width, height, tube count, tube pitch and overall tolerances |
|---|---|
| Tube and membrane | Material grades, tube diameter and thickness; membrane dimensions |
| Geometry | Bends, openings, edge details and assembly interfaces |
| Connections | Header/nozzle layout where included in the scope |
| Order requirements | Number of panels, drawing revisions and documentation |

Our workshop and company materials provide a starting point for discussing fabrication. Project-specific capability, processes and responsibilities are confirmed during technical review.
View our manufacturing page →Identify the component, interfaces and design requirements.
Agree specifications, quantities and supply boundaries.
Confirm inspections and documentation before production.
Agree transport requirements and the shipment schedule.
Panel dimensions, alignment, material identification and specified weld inspections should be included in the agreed inspection plan.
GCB’s Chinese Class A boiler component license covers serpentine tubes, headers, membrane walls and finned economizers. Other equipment inquiries require separate confirmation of applicable authorization and supply scope.
View the original license and scope →Include the destination, handling limits and preferred delivery schedule in your inquiry. Packing, lifting and transport arrangements are agreed for the actual order.
Send the existing layout, material details and interface dimensions so the required panel can be reviewed.
Yes. Mark all openings, bends and connection locations on the drawings to avoid ambiguity.
Provide original drawings where possible and identify which field measurements may have been affected by service distortion.
Email drawings, quantities and project requirements to our team.
info@gcboiler.cnAttach drawings in your email application. You can also copy the address and send through webmail.